UAE Utilities Guide

Independent guide for people moving into a UAE home · Last verified November 2026

Dubai · Sharjah · Abu Dhabi · Northern Emirates

Electricity and water in the UAE, without the runaround

Every move in the UAE starts the same way: a new utility account. The company changes with the emirate, the deposit changes with the property, and the bill changes with the season. This guide puts the four providers side by side so you can set up power and water once, correctly, and read the bill when it arrives.

Last verified: November 2026. Deposit and tariff figures below were checked against DEWA's published pages and the providers' own sites. Sources are linked on each page.

Moving to Dubai?

DEWA is your provider. The deposit is AED 2,000 for a flat and AED 4,000 for a villa, plus about AED 155 in activation charges. Once your Ejari is registered, DEWA usually emails you the payment link itself and connects supply within 15 working hours of payment.

DEWA move-in, step by step

Moving anywhere else?

Sharjah runs on SEWA, Abu Dhabi on TAQA (ADDC for distribution), and Ras Al Khaimah, Ajman, Fujairah and Umm Al Quwain on Etihad Water and Electricity. The process is similar; the deposit and the portal are not.

Which company serves your emirate

Your bill, line by line

A DEWA bill is not one number. It is slab-priced electricity, slab-priced water, a fuel surcharge that moves monthly, 5% VAT, a Dubai Municipality housing fee and a sewerage charge. Here is what each line means and how to check it.

Reading your DEWA bill

What will it cost?

Two free estimators, both worked from the published tariffs. One totals your move-in deposit and activation charges; the other rebuilds a DEWA bill from your monthly kWh and water use.

Move-in cost estimator · DEWA bill estimator

Who supplies what, at a glance

EmirateElectricity & water providerWhere to apply
DubaiDEWA — Dubai Electricity and Water Authoritydewa.gov.ae or the DEWA app
SharjahSEWA — Sharjah Electricity, Water and Gas Authoritysewa.gov.ae
Abu DhabiTAQA, distribution by ADDC (Abu Dhabi Distribution Co.)ADDC / TAQA customer portal
Ras Al Khaimah, Ajman, Fujairah, Umm Al QuwainEtihad Water and Electricity (Etihad WE)etihadwe.ae

District cooling is separate from electricity and water in many Dubai and Abu Dhabi towers. If your building has chilled water, you will hold a second account — usually with Empower, Emicool or Tabreed — and a second monthly bill. That is normal, and it is the line most new tenants forget to budget for.

Three things that catch new tenants out

The housing fee. Dubai Municipality charges 5% of your annual rent, collected monthly through the DEWA bill. On a AED 84,000-a-year flat that is AED 350 a month, every month, and it is not refundable. It is often the largest single line after electricity in summer.

The deposit is not a fee. The AED 2,000 or AED 4,000 DEWA deposit comes back when you move out and the final bill is settled — for deposits up to AED 4,000 with no outstanding balance, DEWA's published standard is a refund within minutes to a bank account. The activation charges, about AED 155, do not come back.

Summer bills double. A two-bedroom flat that uses 600 kWh in February can use 1,400 kWh in August, and the slab rate rises as usage rises. Budget for August, not for February.

Start with the DEWA move-in guide if you are heading to Dubai, or the emirate-by-emirate page if you are going anywhere else.