Tool · Dubai
DEWA bill estimator
Rebuild a DEWA bill from your monthly electricity and water use, using the published slab tariffs. It shows each line — slabs, fuel surcharge, sewerage, housing fee and VAT — so you can see which part of the bill is doing the damage.
Last verified: November 2026. Electricity slabs 23/28/32/38 fils per kWh; water AED 7.70 / 8.80 / 10.12 per m³; fuel surcharge 6 fils per kWh and AED 1.10 per m³ (September 2026); sewerage about AED 4.40 per m³ (2 fils per gallon, Decree No. 47 of 2024); VAT 5%. Source: DEWA slab tariff page, dewa.gov.ae.
Worked example (pre-filled): 800 kWh, 20 m³ of water, rent AED 84,000 a year — electricity AED 184.00, electricity surcharge AED 48.00, water AED 154.00, water surcharge AED 22.00, sewerage AED 88.00, housing fee AED 350.00, VAT AED 20.40. Total about AED 866.40.
How the estimate is built
Electricity is priced slab by slab: 23 fils per kWh up to 2,000 kWh, 28 fils to 4,000, 32 fils to 6,000 and 38 fils above that. Water is priced per cubic metre: AED 7.70 for the first 27 m³, AED 8.80 to 54 m³, AED 10.12 above. The September 2026 fuel surcharge — 6 fils per kWh and AED 1.10 per m³ — is added on top; the surcharge changes monthly, so treat the result as an estimate for the current month and check DEWA's site for the latest figure. Sewerage is charged at about AED 4.40 per m³ for 2026. The housing fee is 5% of annual rent divided by 12. VAT at 5% is applied to the consumption charges and surcharges. Meter service charges and any district cooling bill are not included — cooling is a separate account in many towers.
When the estimate will be wrong
It will be wrong in the month the fuel surcharge moves, which is most months, and it will be wrong if your building bills water differently or if you are a UAE national on the lower tariff. Use it to budget and to spot a bill that looks far out of line, not as a promise of the exact dirham amount. If your real bill is much higher than the estimate with the same usage, check the meter reading on the bill against the meter itself first.